Ignore Bhowle about Joshimath; Uttarakhand government’s serious allegation
After the commencement of the work of ‘Tapovan-Vishnugad Hydroelectric Project’ by ‘National Thermal Power Corporation’ (NTPC), the local people say that the houses have to get scared. It was first realized in the month of November 2021. Joshimath’s empty tapovan-Vishnugad project’s bogda is ready. A large number of explosives are used for its preparation. Yanda 3 Janwala NTPC used blaster on a large scale. That’s why it is seen that the evidences of a large number of families suffering from bhaga are increasing. Meanwhile, in the year 1976, any tinkering with Joshimath could be dangerous, Mishra commission would have given such a report.
Covenant: Nashikala Hadarvanari incident; PTC teacher commits obscene act with student
In the year 1976, the Mishra Commission conducted the survey of Joshimath. In that, Joshimath was said to be the Morainvar (soil that comes along with the Himanga). That’s why it is very sensitive. In case of tampering with the mulashi of Joshimath, fraud can be created, as Mishra commission had said in the report.
Also, don’t let the rocks and stones with mulashi of Joshi Math reach us. At the same time, the construction being done here would have been done in a limited scope, he would have given such advice. However, the implementation of the Mishra commission could not be done properly.
Vacha: Running in the local, the girl’s chest hurts, 2 female TC angels run, and others…